Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637635

- Product Categories
- Friendly Links
Information Name: | Plumbing, pipes, Tianjin Jinzhong Ji Engineering Company |
Published: | 2015-01-17 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | [Tianjin Jinzhong Ji HVAC purification equipment to recommend the star product - ventilation pipe installation project] hanger 1, according to the center line of the duct laying boom to identify the location of a single boom in the center line of the duct, centerline double boom can screw spacing according to the tray or duct mounted symmetrically. 2, according to the use of hanging pieces in the form of boom pipe welded to the hanging pieces can also be hung on the hanging pieces, after welding should be painted rust. 3, when the duct is longer, you need to install a row of brackets can be first well at both ends, and then stand at both ends of the pipeline as a benchmark to identify elevations middle bracket with cable installation method. 4, the riser card is installed, you should first of a pipe top fixed, then the line hammer hanging wire at the center of the pipe specification, the following control cards can be fixed by line. [Tianjin Jinzhong Ji HVAC purification equipment to recommend the star product - a ventilation pipe project], metal duct reinforcement shall meet the following requirements; a) round duct (not including spiral duct) 800mm diameter greater than or equal , and the pipe length is greater than 1250mm or the total surface area greater than 4m2 reinforcement measures should be taken; 2) rectangular duct length was longer than 630mm, duct insulation edge longer than 800mm, 1250mm pipe length is greater than or unilateral level low pressure duct area of ??more than 1.2 m2, medium, high pressure air hose pipes measuring more than 1.0m2, shall take reinforcement measures; 3) irregular oval duct reinforcement, pipe execution should refer to the rectangular duct. 2, rectangular duct elbow production, generally should be used as a flat radius of curvature of the inner and outer concentric curved side bends. When using other forms of bending, flat edge longer than 500mm, you must set the elbow deflector. Plumbing, pipes, Tianjin Jinzhong Ji Engineering Company provided by the Tianjin Jinzhong Ji HVAC purification equipment. Tianjin Jinzhong Ji HVAC purification equipment Limited (www.Jzjnt.com) strong, credible, in Tianjin fans, ventilation equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the group into the brilliant and you work for a better future! |
Admin>>>
You are the 26616 visitor
Copyright © GuangDong ICP No. 10089450, Purification Equipment Co., Ltd., Tianjin Jinzhong Ji HVAC All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26616 visitor
Copyright © GuangDong ICP No. 10089450, Purification Equipment Co., Ltd., Tianjin Jinzhong Ji HVAC All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility